top of page

T-Pylon preparation at Hinckley, United Kingdom

  • Mette Mikkelsen
  • 10. mar. 2021
  • 1 min læsning

Located in the centre of the project and set to connect high voltage energy from Hinkley Point C, to the UK transmission grid, The first foundations are ready for T-pylons to be installed.

Read more: https://hinkleyconnection.co.uk/

ree

photo: Steven Haskayne, Nationalgrid

 
 
 

Kommentarer


© BYSTRUP 2021

bottom of page